Project Overview

Technofit Sdn Bhd is a vast and rapid growth engineering and maintenance services company. With almost experience in the field of Construction and Maintenance of Power Projects of various types and sizes of plant items it shows our commitment and reputation in bring and give the best services to the customers.

Armed with committed and skilled manpower and latest machinery, Technofit is well equipped to undertake construction of Power Plants with latest design. 18th years in the industry, our services become broad and ranging from erection, installation, revamp rejuvenation, turnaround, services and maintenance of power generation, oil & gas plant. Proudly, Technofit has broad network of operations throughout Malaysia serving the nation by constructing Power Plant as per exactly according to the owners requirements through EPC organization. Till date, more than 7,950MW of power has been contributed in generation. With an additional expertise in the erection of steam turbines, gas turbines with their associated generators and auxiliary, coal fired boilers, Heat Recovery Steam Generator, waste heat recovery steam generators, power cycle piping and balance of plant including flue gas desulphurization (FGD) plant.

Over 18th years of progressive and hands-on experience in installation , erection and maintenance in plant such as piping fabrication, installation, tie-in, revamp, tank fabrication and others equipment installation to provide valuable expertise in the area of fitting, welding, lifting, installation and modification of any type piping, pressure part and non-pressure part.

Follow a positive vibe and never look back, by continuing professionalism and sincere effort Technofit has come a long way forward and now become the one of the most reputable organization constantly ready to meet the ever demanding requirements of respected clients. Owned a track record of substantial growth, customer satisfaction and innovation, it makes we believe that progress must be achieved synchronised with the environment. A piece of commitment to community welfare and environment protection were part of our corporate vision.

Certified with ISO 9001: 2008 Management System and Health, Environment and Safety Management System shows our commitment and committed to give the best services to our client. By sustained this two vital system to the company its hope to fit with the industry and support the business activity also fulfil the client’s requirements.

Technofit Sdn Bhd aimed for the outstanding project in future and not limited only in Malaysia but also in abroad since we have the opportunity recently have a project in Phatum Thani, Thailand. As one of Top Ten of Outstanding Company in Malaysia under SME , Technofit believe to become one of local company to be a multinational company and try to give support for the nation and youth development.

Energy 11
Energy 7
TFF7
Project Experience in Power Generation
Erection works for boiler pressure and non pressure parts – 2 x 500 MW for Sultan Salahuddin Abd Aziz Station, Phase 3 Kapar.
General Installation Works (rotary & static equipment), Kerteh Aromatics Project (KR-2).
Compressor and Turbine installation for Malaysia Olefins Project (MOP), Kerteh.
Erection works for the boiler pressure and non pressure parts- 3 x 700MW for Manjung Coal Fired Plant.
Erection of BOPM piping works for Prai 350MW Combined Cycle Gas Turbine (CCGT) Power Plant, Prai.
Erection works for the boiler pressure and non pressure parts – 3 x 700MW Tanjung Bin Coal Fired Plant.
Erection of 2 x 700MW Jimah Coal Fired Plant.
Erection works for 2 off HRSG’s for Petronas fertilizer, Gurun, debottlenecking project.
Prai 1054MW CCGT Project.
Redevelopment of Connaught Bridge 348MW Combine Cycle Gas Turbine Project
Project Experience on Boiler Tube Replacement / Repair
H112 Zone-5 and Zone-6 radiant & SLE coils renewal March 2009.
Unit 3 HTS 1 Pendant Tube Repair Work at TNB Jana Manjung.
Unit 3 Reheater vertical & horizontal tube repair, 2nd repair at Kapar Energy Venture.
Unit 5 Boiler tube leak repair work at Primary superheater tubes at Kapar Energy Venture.
3 x 700MW Coal Fired Power Plant, Tanjung Bin Reheater Panel Replacement Works for Unit # 20.
Carry out final superheater tube replacement at unit 20 during force outage at Tanjung Bin Power Plant.
Unit 5 Boiler reheater right site wall panel, platen & division wall superheater tube replacement work during major outage October 2011 for Kapar Energy Venture.
Project Experience on Air Preheater Projects
Unit 1 - Regenerative air heater (LHS & RHS) major repair and servicing works during Unit 1 major overhaul for boiler maintenance section at TNB Manjung Sdn Bhd.
Supply Air Preheater sector plates for Boiler Maintenance Section at Stesen Janakuasa Sultan Azlan Shah, TNB Manjung Sdn Bhd.
Supply Air Preheater Basket element for Boiler Maintenance Section at Stesen Janakuasa Sultan Azlan Shah, TNB Manjung Sdn Bhd.
Inspection, repair, commissioning of Guide Bearing at Unit 1 RHS Air Preheater Stesen Janakuasa Sultan Azlan Shah.

Our Previous & Current Projects

No. Work Description Main Contractor Client Starting Date Completion Date
1 General Equipment Installation Work for Kerteh Aromatics Project (KR-2), Paka Terengganu. Equater Engineering Sdn Bhd Lot 38 & 39, Section 26, Persiaran Sabak Bernam Hicom Industrial Estate
40704 Shah Alam
Petronas Berhad Petronas Twin Tower Kuala Lumpur February 12, 1998 December 1, 1999
2 Compressor and Turbine Installation Olefins Project, Paka Terengganu Equater Engineering Sdn Bhd Lot 38 & 39, Section 26, Persiaran Sabak Bernam Hicom Industrial Estate
40704 Shah Alam
Petronas Berhad Petronas Twin Tower Kuala Lumpur October 8, 2000 November 30, 2000
3 Installation of Two (2) unit Boiler Heat Recover Steam Generations (HRSG) for PFKSB Plant Debottlenecking Project VICKERS HOSKINS (M) SDN BHD Lot 6074, Jalan Hj. Abdul Manan, Meru 42200 Kapar, Selangor, Malaysia. PETRONAS FERTILIZER KEDAH SDN BHD Km 3, Jalan Jeniang, Gurun Kedah. January 6, 2009 October 30, 2009
4 The Provision of Man Power Supply for Mechanical Works for PESD (PIN Project) Tie-In Piping and Revamp Works (Units 21, 24, 26, 27 & 28) for Melaka Refinery PSR-2 Revamp Project. PFC Engineering Sdn Bhd, E.V Oilfield Supply & Services Sdn Bhd. Plot 3, Jalan Tunas Baru, Seksyen 1, Kawasan Perindustrian Pengkalan Balak, 78000 Masjid Tanah, Melaka. PETRONAS PENAPISAN MELAKA SDN BHD Sungai Udang, Melaka. January 10, 2009 December 31, 2009
5 Installation of Two (2) unit Boiler Heat Recover Steam Generations (HRSG) for PFKSB Plant Debottlenecking Project SHINRYO (MALAYSIA) SDN BHD Unit 24.02, 24th Floor, Menara KH Jalan Sultan Ismail 50250 Kuala Lumpur. PETRONAS FERTILIZER KEDAH SDN BHD Km 3, Jalan Jeniang Gurun, Kedah January 11, 2009 August 3, 2010
6 a)Piping Fabrication PP(M)SB Turnaround Project PN210026 & PN 210039
b)Piping Fabrication PP(M)SB PIN Project
c)Piping Fabrication PP(M)SB PSR-2 REVAMP Project
PFC Engineering Sdn Bhd
E.V Oilfield Supply & Services Sdn Bhd
Plot 3, Jalan Tunas Baru, Seksyen 1, Kawasan Perindustrian Pengkalan Balak, 78000 Masjid Tanah Melaka.
PETRONAS PENAPISAN MELAKA SDN BHD Sungai Udang, Melaka. March 7, 2009 March 2, 2010
7 The Provision of Man Power Supply for Mechanical Works for PESD (PIN Project) Tie-In Piping and Revamp Works (Units 21, 24, 26, 27 & 28) for Melaka Refinery PSR-2 Revamp Project. PFC Engineering Sdn Bhd Level 22, Maju Tower 1001 Jalan Sultan Ismail, Kuala Lumpur. PETRONAS PENAPISAN MELAKA SDN BHD Sungai Udang, Melaka. November 18, 2009 April 15, 2010
No. Work Description Main Contractor / EPCC Client Start Date Completion Date
1 2 x 500MW KAPAR PHASE 3 PLANT

Fittings and Welding Works for Boiler Pressure & Non Pressure parts
EQUATOR ENGINEERING / IHI TENAGA NASIONAL BHD September 23, 1996 August 31, 1998
2 3 x 700MW MANJUNG COAL PLANT

Erection, Fittings and Welding Works for Boiler Pressure & Non Pressure parts
EQUATOR ENGINEERING /
ALSTOM
TENAGA NASIONAL BHD November 22, 2000 June 15, 2002
3 350MW CCGT PRAI POWER PLANT

Piping works installation for the balance of plant inclusive Turbine, Compressor and jetty
house.
EQUATOR ENGINEERING /
TOSHIBA TPK
SKS POWER June 15, 2002 November 30, 2002
4 3 x 700MW TANJUNG BIN COAL PLANT

Erection, Fittings and Welding Works for Boiler Pressure & Non Pressure parts
SHIN EVERSENDAI
ENGINEERING / IHI
TANJUNG BIN POWER,
MALAKOFF
May 16, 2005 December 31, 2006
5 HRSG Erection, Testing and Commissioning SHIN EVERSENDAI
ENGINEERING / IHI
JIMAH POWER May 16, 2007 September 1, 2008
6 CONNAUGHT BRIDGE POWER STATION SAMSUNG C&T(KL) TENAGA NASIONAL BHD December 30, 2013 Hand Over on 9 March 2016
7 384.7MW COMBINED CYCLE GENERATING PLANT REDEVELOPMENT PROJECT AT CONNAUGHT BRIDGE POWER STATION
HRSG Erection, Testing and Commissioning
SINOHYDRO CORP TENAGA NASIONAL BHD May 27, 2014 Ongoing Contractual 1 Sep 2015
No. Work Description CONTRACT NO Client Start Date Completion Date
1 SUPPLY ,INSTALL & COMMISIONING OF
ONE (1) 240MVA YNAD1 AUTOTRANSFORMER AS REPLACEMENT FOR PMU SKUDAI SUPERGRID TRASNFORMER
TNB 200/2012 TENAGA NASIONAL SDN BHD (TNB) July 24, 2012 February 18, 2013
2 CONVERSION FROM 2X60MVA 132/32KV
TO 2 X90MVA 132/33KV AT PMU TASEK SIMEN GIS,PERAK
TNB 424/2012 TENAGA NASIONAL BERHAD (TNB) March 26, 2013 ON GOING
CONTRACTUAL COMPLETION IS 1 DEC 2014
3 SUPPLY, ERECT AND COMMISIONING OF 275 KV AND 132 KV SWITCHGEAR TRANSFORMER AND ANCILLARY EUPM, COMPLETE WITH ASSOCIATES FOR PMU 275/132 KV KUALA KETIL EXTENSION (240 MVA) KEDAH TNB 11/2014 TENAGA NASIONAL BERHAD (TNB) January 29, 2014 ON GOING CONTRACTUAL COMPLETION IS 29 SEPTEMBER 2015
4 SUPPLY AND INSTALL OF ONE UNIT 275/132 KV 240 MVA YNAD1 AUTO TRANSFORMER TO TNB ASSET MAINTENANCE DEPT FOR USE AS STRATEGIC SPARE TNB(T) 13/2014 TENAGA NASIONAL BERHAD (TNB) February 14, 2014 ON GOING CONTRACTUAL COMPLETION IS 14 DECEMBER 2014

FEATURED PROJECTS

Get A Free Quote For Your Next Project

Uniquely matrix economically sound value through cooperative technology. Competently parallel task fully researched data and enterprise process improvements. Collaboratively expedite quality manufactured products via client-focused results Synergistically deliver performance based methods of empowerment whereas distributed expertise

CONTACT US

I am raw html block.
Click edit button to change this html

Our Previous & Current Projects