PROJECTS

Our Track Records and Successful Projects

MORE THAN 20 YEARS DELIVERING PROJECTS BEYOND CLIENTS EXPECTATION

We have successfully excelled projects for our clients since 1998. With over 20 years of experience in the industry, we expanded our services to civil, mechanical, and electrical works. Our specialization includes erection, installation, revamp rejuvenation, turnaround, services, and maintenance of power generation, oil & gas plant.

Proudly, TECHNOFIT has a broad network of operations throughout Malaysia. We serve the nation by constructing Power Plant according to the client's requirements through the EPCC organization. To date, more than 7,950MW of power generated from our electrical works.

TECHNOFIT's professionalism and skills have come a long way forward and now become one of the most reputable organizations that are constantly ready to meet the ever-demanding requirements from respected clients.

TECHNOFIT aim for high impact project in future and had the opportunity to work on Pathum Thani, Thailand. Hence, we are looking for more opportunities to expand our services globally. As an award-winning company, we believe that we will deliver your project's needs.

PROJECT TRACK RECORD

Less Talk, More Action. Here is our track record for the past 20 years

Edit Content
miner
Erection Works For Boiler Pressure And Non Pressure Parts – 2 x 500MW for Sultan Salahuddin Abd Aziz Station, Phase 3 Kapar
miner
Compressor And Turbine Installation For Malaysia Olefins Project (MOP), Kerteh
miner
General Installation Works (Rotary & Static Equipment), Kerteh Aromatics Project (KR-2)
miner
Erection Works For The Boiler Pressure And Non Pressure Parts – 3 x 700MW For Sultan Azlan Shah Power Station, TNB Janamanjung Sdn Bhd
miner
Erection Of BPOM Piping Works For Prai 350MW Combined Cycle Gas Turbine (CCGT) Power Plant
miner
Erection Works For The Boiler Pressure And Non Pressure Parts – 3 x 700MW Tanjung Bin Power Plant
miner
Erection of 2 x 700MW Jimah Power Station
miner
HRSG Erection Work For Prai 1071MW Combined Cycle Gas Turbine (CCGT)
miner
1 x 1000MW Fast Track 3A Manjung 5 Project
miner
Engineering, Procurement, Contracts And Construction (EPCC) for 2nd Demineralize Water Tank For NUR Generation Sdn Bhd
miner
Redevelopment of Connaught Bridge 348MW Combine Cycle Gas Turbine Project
miner
MY 1008 BOP Pengerang Cogeneration Plant
miner
Erection Works For 2 Off HRSG’s for Petronas Fertilizer, Gurun – Debottlenecking Project
Edit Content
miner
Carry Out Boiler Tube Replacement Work & Other Repair Work During Unit #2 Planned Outage At Manjung Power Station
miner
Carry Out Boiler Tube Replacement Work & Other Repair Work During Unit #2 Planned Outage At Manjung Power Station
miner
Carry Out Boiler Tube Replacement Work & Other Repair Work During Unit #3 Planned Outage (May 2018) Maintenance Section At Manjung Power Station
miner
Unit 20 Mini Outage (Nov 2018) BMS : Boiler Tube Repair Work At Jimah Power Station
miner
Carry Out Boiler Tube Replacement Work & Other Repair Work During Unit #1 Planned Outage (Oct 2018) For Boiler Maintenance Section At Manjung Power Station
miner
Carry Out Ajinomoto Factory Boiler Tube Replacement Work At Ajinomoto Power Plant, Phatum Thani, Thailand
miner
Unit 10 Mini Outage (Feb 2019) BMS : Boiler Tube Repair Work At Jimah Power Station
miner
Carry Out Boiler Tube Replacement Work & Other Repair Work During Unit #3 Planned Outage (April 2019) For Boiler Maintenance Section At Manjung Power Station
miner
Carry Out Unit #4 Major Outage (June 2019) Boiler Tube Replacement Work at Kapar Power Station
Edit Content
miner
Supply & Delivery of Regenerative Air Heater Guide & Support Bearing For Boiler Maintenance Section (GF1) At Manjung Power Station
miner
Unit #4 Major Outage (Dec 2018) Supply, Install, Testing, Commissioning & Warranty GAH Elements & Seals At Kapar Power Station
miner
Carry Out Regenerative Air Heater (LHS & RHS) Servicing Works During Unit #3 Planned Outage (May 2018) For Boiler Maintenance Section At Manjung Power Station
miner
Carry Out Regenerative Air Heater (LHS & RHS) Servicing Works During Unit #1 Planned Outage (Oct 2018) For Boiler Maintenance Section
miner
M2MO : Regenerative Air Heater Ducting Inspection And Repair Work During M2 Major Overhaul For Boiler Maintenance Section At Manjung Power Station
miner
Unit #5 Supply Gas Air Heater Seals & Cold End Element At Kapar Power Station
Edit Content
miner
Supply, Install and Commissioning of One (1) 240MVA YNad1 Auto Transformer as Replacement Complete With Associated Civil Works For PMU Skudai Supergrid Transformer
miner
Conversion From 2 x 60MVA 132/22kV to 2 x 90MVA 132/33kV At PMU Tasek Cement GIS, Perak
miner
Supply, Erect and Commissioning of 275kV and 132kV Switchgear, Transformer and Ancillary Equipment, Complete With Associated Civil Works For PMU 275/132kV Kuala Ketil Extension (240MVA)
miner
Supply And Install of One (1) Unit 275/132kV 240MVA YNad1 Auto Transformer To TNB Asset Maintenance Department For Use As Strategic Spare
miner
Supply Of One (1) Unit Of 250MVA 500/275kV Single Phase Auto Transformer For 500kV Ayer Tawar Substation As Strategic Spare
miner
Supply of Three (3) Units of 500kV Inductive Voltage Transformer For Jabatan Senggaraan Aset Johor 1-JB, Bahagian Penghantaran TNB

PROJECT INFORMATION

Here is the list and summary of our notable projects delivered to the clients

New Plant Installation

Connaught Bridge

TECHNOFIT involved in HRSG Erection, Testing, and commissioning for 384.7MW combined cycle generating (CCGT) plant redevelopment project at TNB Connaught Bridge, Klang, Selangor, Malaysia. The

Read More »